Formula 1 motorsport
| Application: |
Engine |
| Component: | Injection rail |
| Task: |
Manufacture of different assemblies which are then connected together by welding to an injection rail The functionality was tested by leak-testing (300 bar) each injection rail. |
| Requirement: | Optimisation of the process steps with the lowest possible expenditure on material |
| Challenge: | Realisation and testing of the required functionalities from the simulation and calculation models. |
| Solution: | Quality of the prototypes of series components for the evaluation of the requirements and optimisation of individual process steps |
| Success: | Required functionalities in the target cost framework for components and tools have been realised and for the most part exceeded |